Zoning
The following services are provided within the scope of the OSB Law No. 4562, Zoning Law No. 3194, Building Inspection Law No. 4708 and the related application regulations of the relevant laws. The processes are inspected within the scope of the relevant legislation.
- Location Selection and Facility Establishment Permit,
- Zoning Status,
- T.R. Address Registration Procedures in the Address Registration System of the General Directorate of Population and Citizenship Affairs of the Ministry of Interior,
- Building Permit,
- Monitoring the Building Inspection System of the General Directorate of Construction Affairs of the Ministry of Environment, Urbanization and Climate Change,
- Obtaining Parcel Information from the Land Registry and Cadastre Information System,
- Building Usage Permit,
- Control and Monitoring of Unlicensed and Illegal Buildings,
- Technical Support to Regional Participants,
- Issuing of Work Completion Certificate.
Environment
The following services are provided within the scope of the OIZ Law No. 4562, the Environmental Law No. 2872 and the related application regulations of the relevant laws. Processes are inspected within the scope of relevant legislation.
- Environmental Impact Assessment (EIA) Application File Control and Writing Institutional Opinion to Provincial Environment, Urbanization and Climate Change Directorate,
- Channel Connection Permit,
- Trial Permit,
- Business Opening and Operation License,
- Participatory Wastewater Controls and Analyses,
- Calculation of Wastewater Treatment Fees,
- Wastewater Treatment Plant Operator and Discharge Quality Controls,
- Network Water Controls and Analyses,
- Establishment and Operation of Zero Waste System,
- Relevant Legislation Information,
Wastewater Treatment Plant
The daily treatment capacity of our Wastewater Treatment Plant, which was put into operation in 2012 and contains physical, chemical and biological treatment units, is 2000 m3. In addition to treating all domestic and industrial wastewater in the region, wastewater is also accepted from outside the region by transportation.
The treatment plant outlet water is discharged into Yumrukaya Creek in accordance with the discharge standards specified in Table 19 of the Water Pollution Control Regulation.
RELATED DOCUMENTS:
- For GSM Application Petition Sample Click.
- GSM Document List for Click.
- For GSM Engine Power Declaration Click.
- For Construction Disengagement Request Petition Click.
- For Zoning Status Request Petition Click.
- Business Opening and For the Work Permit Commitment Click.
- Building Usage Permit Application Petition Click.
- Building Permit Request Petition Click.
- Ç.FR.37 EIA Commitment Form Click.
- Ç.FR.36 EIA Application Petition Form Click.