The energy needs of GÜZELLER OSB are met by TEİAŞ via 3(1*240) Underground Energy Lines from the Gosb TM 154/34.5kV, independent feeder from the step-down transformer center. Permissions for the second feeder have been obtained and the second feeder will be put into operation within the year.
The electricity distribution of GÜZELLER OSB is carried out via an underground cable network. There is 1 Main Distribution Center and 3 Distribution Centers in the OSB.
Within the scope of the distribution license dated 29.11.2007 and numbered ED/OSB/1391-2/1005 obtained by our Güzeller Organized Industrial Zone Directorate, electricity distribution services within the borders of the OSB have been provided by us as of 29.11.2007. Güzeller OSB. Our installed capacity is 96 MW and our demand capacity is 28 MW. Monthly consumption is between 12-13 million kWh.
Our Electricity Operation Unit provides 24/7 service to resolve distribution-related problems and fixes malfunctions in the shortest time possible. The electrical unit is involved in the main items such as fault response, system operation, electricity distribution, electricity supply at a reasonable price, tender works, new line installation, project approval, new facility acceptance processes, solar energy installation processes.
Companies that want to have an electricity subscription must have the documents listed below, as well as the authorized signatory and their stamps.